Sectors · Hotels

Solar and storage for hotels.

Hotels never switch off: laundry, kitchens, pools and rooms draw around the clock. Solar plus storage cuts the bill at every hour guests are paying for.

Drone view of a full flat-roof solar array on a hotel site

A day at a hotel.

Hotels never switch off: breakfast service, laundry through the day, then the evening peak of kitchens, bars and full rooms. Solar covers the daytime; the battery carries the hours guests are paying for.

Case studies

Delivered in hotels.

Premier Inn — UK rollout — Hotels solar installation by Novalux
Hotels · UK-wide

Premier Inn — UK rollout

Roof-mounted systems delivered across the Premier Inn UK estate for Whitbread PLC — 34 sites completed, from Darlington to Paignton.

Payback 4.5–6.2 yrs per site ROI 18–25% IRR per site
Hotel — Tenby — Hotels solar installation by Novalux
Hotels

Hotel — Tenby

28.91 kWp delivered — hotels.

Payback 4.29 yrs ROI 26.0% IRR
Premier Inn — Haverfordwest — Hotels solar installation by Novalux
Hotels

Premier Inn — Haverfordwest

80.24 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 23.0% IRR
Premier Inn — Minehead — Hotels solar installation by Novalux
Hotels

Premier Inn — Minehead

77.88 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 22.8% IRR
Premier Inn — Hayes, London — Hotels solar installation by Novalux
Hotels

Premier Inn — Hayes, London

69.85 kWp delivered — hotel rollout.

Payback 5.0 yrs ROI 22.4% IRR
Premier Inn — Paignton — Hotels solar installation by Novalux
Hotels

Premier Inn — Paignton

69.02 kWp delivered — hotel rollout.

Payback 5.2 yrs ROI 21.6% IRR
Premier Inn — Newton Abbot — Hotels solar installation by Novalux
Hotels

Premier Inn — Newton Abbot

63.77 kWp delivered — hotel rollout.

Payback 6.2 yrs ROI 18.3% IRR
Premier Inn — Barry Island — Hotels solar installation by Novalux
Hotels

Premier Inn — Barry Island

63.77 kWp delivered — hotel rollout.

Payback 5.8 yrs ROI 20.1% IRR
Premier Inn — Wrexham — Hotels solar installation by Novalux (representative image)
Hotels

Premier Inn — Wrexham

62.54 kWp delivered — hotel rollout.

Payback TBC ROI TBC
Premier Inn — Bristol — Hotels solar installation by Novalux
Hotels

Premier Inn — Bristol

62.01 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 22.9% IRR
Premier Inn — Cambridge — Hotels solar installation by Novalux
Hotels

Premier Inn — Cambridge

61.92 kWp delivered — hotel rollout.

Payback 5.5 yrs ROI 20.4% IRR
Premier Inn — Gosport — Hotels solar installation by Novalux
Hotels

Premier Inn — Gosport

61.36 kWp delivered — hotel rollout.

Payback 5.0 yrs ROI 22.4% IRR
Premier Inn — Evesham — Hotels solar installation by Novalux
Hotels

Premier Inn — Evesham

59 kWp delivered — hotel rollout.

Payback 4.7 yrs ROI 23.8% IRR
Premier Inn — Manchester — Hotels solar installation by Novalux (representative image)
Hotels

Premier Inn — Manchester

56.14 kWp delivered — hotel rollout.

Payback 5.2 yrs ROI 21.6% IRR
Premier Inn — Seaton — Hotels solar installation by Novalux
Hotels

Premier Inn — Seaton

55.69 kWp delivered — hotel rollout.

Payback 4.5 yrs ROI 24.7% IRR
Premier Inn — Ringwood — Hotels solar installation by Novalux
Hotels

Premier Inn — Ringwood

52.07 kWp delivered — hotel rollout.

Payback 4.7 yrs ROI 23.6% IRR
Premier Inn — High Wycombe — Hotels solar installation by Novalux
Hotels

Premier Inn — High Wycombe

48.95 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 22.9% IRR
Premier Inn — Epsom — Hotels solar installation by Novalux
Hotels

Premier Inn — Epsom

46.75 kWp delivered — hotel rollout.

Payback 5.2 yrs ROI 21.5% IRR
Premier Inn — Eltham, London — Hotels solar installation by Novalux
Hotels

Premier Inn — Eltham, London

46.5 kWp delivered — hotel rollout.

Payback 5.1 yrs ROI 22.2% IRR
Premier Inn — Bicester — Hotels solar installation by Novalux (representative image)
Hotels

Premier Inn — Bicester

46.4 kWp delivered — hotel rollout.

Payback 5.1 yrs ROI 22.1% IRR
Premier Inn — Matlock — Hotels solar installation by Novalux
Hotels

Premier Inn — Matlock

46.02 kWp delivered — hotel rollout.

Payback 4.6 yrs ROI 24.1% IRR
Premier Inn — Witney — Hotels solar installation by Novalux
Hotels

Premier Inn — Witney

45.24 kWp delivered — hotel rollout.

Payback 5.1 yrs ROI 22.0% IRR
Premier Inn — Sheffield — Hotels solar installation by Novalux
Hotels

Premier Inn — Sheffield

44.84 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 22.9% IRR
Premier Inn — Southampton — Hotels solar installation by Novalux
Hotels

Premier Inn — Southampton

44.25 kWp delivered — hotel rollout.

Payback 5.3 yrs ROI 21.2% IRR
Premier Inn — Abergavenny — Hotels solar installation by Novalux
Hotels

Premier Inn — Abergavenny

43.29 kWp delivered — hotel rollout.

Payback 5.4 yrs ROI 20.8% IRR
Premier Inn — Honiton — Hotels solar installation by Novalux
Hotels

Premier Inn — Honiton

43.29 kWp delivered — hotel rollout.

Payback 4.8 yrs ROI 23.3% IRR
Premier Inn — Leek — Hotels solar installation by Novalux
Hotels

Premier Inn — Leek

42.34 kWp delivered — hotel rollout.

Payback 5.3 yrs ROI 21.2% IRR
Premier Inn — Tenby — Hotels solar installation by Novalux
Hotels

Premier Inn — Tenby

41.3 kWp delivered — hotel rollout.

Payback TBC ROI TBC
Premier Inn — Havant — Hotels solar installation by Novalux
Hotels

Premier Inn — Havant

41.25 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 22.8% IRR
Premier Inn — Harlow — Hotels solar installation by Novalux
Hotels

Premier Inn — Harlow

40.12 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 23.0% IRR
Premier Inn — Darlington — Hotels solar installation by Novalux
Hotels

Premier Inn — Darlington

39.53 kWp delivered — hotel rollout.

Payback 4.9 yrs ROI 23.1% IRR
Premier Inn — Marlborough — Hotels solar installation by Novalux
Hotels

Premier Inn — Marlborough

34.22 kWp delivered — hotel rollout.

Payback 4.7 yrs ROI 23.9% IRR
Premier Inn — Wells — Hotels solar installation by Novalux
Hotels

Premier Inn — Wells

33.345 kWp delivered — hotel rollout.

Payback 5.4 yrs ROI 20.9% IRR
Premier Inn — Widnes — Hotels solar installation by Novalux
Hotels

Premier Inn — Widnes

31.27 kWp delivered — hotel rollout.

Payback 4.8 yrs ROI 23.4% IRR
Premier Inn — Felixstowe — Hotels solar installation by Novalux
Hotels

Premier Inn — Felixstowe

31.59 kWp delivered — hotel rollout.

Payback 5.3 yrs ROI 21.4% IRR
Premier Inn — Clapham, London — Hotels solar installation by Novalux
Hotels

Premier Inn — Clapham, London

30.25 kWp delivered — hotel rollout.

Payback 5.6 yrs ROI 20.0% IRR

See the numbers for your hotel site.

A Quick Quote with system design, 25-year cashflow and return on investment — free, and subject to nothing.

quick quote in 24hrs · full proposal within 5 days of survey

We call to confirm your setup before the numbers go out.

or call 01600 213 213