Projects
Installed and proven, from 50kWp to megawatt-plus.
Every system below turned energy from a cost into an asset. Each project has its own case study — what we built, and what it pays back. Click a pin or a card.
■ around 50 commercial systems delivered across the UK · pins open each project · rollout programmes span multiple sites

Twinings
A 1.25MWp rooftop system for Twinings, part of ABF Group PLC — won through a rigorous tender process.

R.S. Cockerill
A three-farm solar and storage programme across Yorkshire for one of the region’s major potato businesses.

Hartley's
A 542.80 kWp rooftop system for Hartley's Yorkshire farming and processing operation — 920 panels across the site.

National hotel chain
Roof-mounted systems delivered across a hotel group’s UK estate — 34 sites completed, from Darlington to Paignton.

National furniture chain
A five-store rollout for a national furniture retailer — around 620 kWp delivered across the group.

LWC Drinks
The UK’s largest private drinks distributor — three depots delivered, more under assessment.

R.S. Cockerill — Providence
687.89 kWp delivered — agriculture.

Grain store — Northamptonshire
417.6 kWp delivered — agriculture.

R.S. Cockerill — Barmby
292.19 kWp delivered — agriculture.

Furniture store — Dudley
275 kWp delivered — retail & distribution.

Moonrakers Farm
271 kWp delivered — agriculture.

Bradley Farm — Shropshire
254.88 kWp delivered — agriculture.

LWC Drinks — Liverpool
208.8 kWp delivered — distribution.

Furniture store — Birmingham
172.7 kWp delivered — retail & distribution.
Poultry farm — Brecon
135 kWp delivered — agriculture.
Golf club — East Yorkshire
118.42 kWp delivered — leisure.

Wellington Farm — Worcestershire
117.3 kWp delivered — agriculture.

Furniture manufacturer — Stafford
107.8 kWp delivered — manufacturing.
Fruit farm & farm shop — Herefordshire
103.04 kWp delivered — agriculture.

LWC Drinks — Cornwall
88 kWp delivered — distribution.
Plant rental depot — Worcester
81.88 kWp delivered — distribution.

Link Hall Farm
81.27 kWp delivered — agriculture.

Trade unit — Worcester
78.2 kWp delivered — distribution.
Furniture store — Oldbury
63.25 kWp delivered — retail & distribution.
Furniture store — Shrewsbury
55 kWp delivered — retail & distribution.
Furniture warehouse — Shrewsbury
55 kWp delivered — retail & distribution.

Offices — Widnes
53.46 kWp delivered — commercial property.

Timber merchant — Southampton
37.4 kWp delivered — manufacturing.

Hotel — Tenby
28.91 kWp delivered — hotels.

Automotive workshop — Worcestershire
25.76 kWp delivered — automotive.
Electrical contractor — Birmingham
10.45 kWp delivered — commercial property.
LWC Drinks — Hereford
Completed install — distribution.

Hotel site — Haverfordwest
80.24 kWp delivered — hotel rollout.

Hotel site — Minehead
77.88 kWp delivered — hotel rollout.

Hotel site — Hayes, London
69.85 kWp delivered — hotel rollout.

Hotel site — Paignton
69.02 kWp delivered — hotel rollout.

Hotel site — Newton Abbot
63.77 kWp delivered — hotel rollout.

Hotel site — Barry Island
63.77 kWp delivered — hotel rollout.
Hotel site — Wrexham
62.54 kWp delivered — hotel rollout.

Hotel site — Bristol
62.01 kWp delivered — hotel rollout.

Hotel site — Cambridge
61.92 kWp delivered — hotel rollout.

Hotel site — Gosport
61.36 kWp delivered — hotel rollout.

Hotel site — Evesham
59 kWp delivered — hotel rollout.
Hotel site — Manchester
56.14 kWp delivered — hotel rollout.

Hotel site — Seaton
55.69 kWp delivered — hotel rollout.

Hotel site — Ringwood
52.07 kWp delivered — hotel rollout.

Hotel site — High Wycombe
48.95 kWp delivered — hotel rollout.

Hotel site — Epsom
46.75 kWp delivered — hotel rollout.

Hotel site — Eltham, London
46.5 kWp delivered — hotel rollout.
Hotel site — Bicester
46.4 kWp delivered — hotel rollout.
Hotel site — Matlock
46.02 kWp delivered — hotel rollout.

Hotel site — Witney
45.24 kWp delivered — hotel rollout.

Hotel site — Sheffield
44.84 kWp delivered — hotel rollout.

Hotel site — Southampton
44.25 kWp delivered — hotel rollout.

Hotel site — Abergavenny
43.29 kWp delivered — hotel rollout.

Hotel site — Honiton
43.29 kWp delivered — hotel rollout.

Hotel site — Leek
42.34 kWp delivered — hotel rollout.

Hotel site — Tenby
41.3 kWp delivered — hotel rollout.

Hotel site — Havant
41.25 kWp delivered — hotel rollout.
Hotel site — Harlow
40.12 kWp delivered — hotel rollout.
Hotel site — Darlington
39.53 kWp delivered — hotel rollout.

Hotel site — Marlborough
34.22 kWp delivered — hotel rollout.
Hotel site — Wells
33.345 kWp delivered — hotel rollout.

Hotel site — Widnes
32.45 kWp delivered — hotel rollout.

Hotel site — Felixstowe
31.59 kWp delivered — hotel rollout.

Hotel site — Clapham, London
30.25 kWp delivered — hotel rollout.

Sawmill — 3.5MW programme
A 3.5MW combined ground and rooftop system for a high-usage UK sawmill — £353,335 annual electricity savings and payback in 4.6 years.
See what your site would return.
A Quick Quote with system design, 25-year cashflow and return on investment — free, and subject to nothing.
quick quote in 24hrs · full proposal within 5 days of survey