Projects · Agriculture
R.S. Cockerill
A three-farm solar and storage programme across Yorkshire for one of the region’s major potato businesses.

The project.
1 MW+ solar and 200 kWh battery storage across three farms
Novalux delivered over 1MW of solar and 200kWh of battery storage across the R.S. Cockerill three-farm programme in Yorkshire: Providence (687.89 kWp), Barmby (296.98 kWp) and Link Hall Farm (81.27 kWp with off-grid capability).
Storage lets the farms use their daytime generation through evening and overnight operations instead of exporting it cheaply. Each site has its own case study.
"Novalux were always very transparent about how they were putting together proposal costings around our requirements. They were absolutely safe, and they didn’t disrupt our operations."
In their words.
On site.



3 farms delivered for R.S. Cockerill.
A multi-site installation across the R.S. Cockerill estate in Yorkshire — 1.07 MWp of solar and 200kWh of storage delivered farm by farm, each one commissioned after the last had proved its numbers, up to a battery at Link Hall that runs the farm off-grid and replaces its diesel generation.
Sites with their own case study
See what your roof could return.
A Quick Quote with system design, 25-year cashflow and return on investment — free, and subject to nothing.
quick quote in 24hrs · full proposal within 5 days of survey