Most commercial solar is grid-tied. But for remote sites, new developments facing long connection lead times, or operations where a reinforcement quote runs into six figures, designing for off-grid — or off-grid-capable — operation can be the better answer. The design discipline is different, and it starts with the load, not the roof.
Start from the load profile, not the array
A grid-tied system can be sized loosely — the grid absorbs the difference. Off-grid has no such buffer. Design starts with half-hourly load data across a full year: the winter evening peak matters far more than the summer average. From that profile we size three things together:
- Generation — enough array to cover consumption in the low-irradiance months, not just annually. UK winter output per kWp is a fraction of summer output, and that ratio drives array size.
- Storage — battery capacity for the site’s autonomy requirement: how many hours or days the site must run without meaningful generation.
- Backup — a generator sized for the residual risk, integrated so it charges the battery efficiently rather than idling at low load.
Generator integration done properly
The generator is not a bolt-on. Integrated with the battery inverters, it runs at an efficient load point, charges the battery in short bursts, and stays off the rest of the time — cutting fuel, noise, and maintenance hours dramatically compared with generator-only sites. Novalux has delivered exactly this: a grain store in Northamptonshire runs a 250kW / 276kWh battery integrated with the site’s existing 550kVA diesel generator, and Link Hall Farm — part of the R.S. Cockerill programme — runs an 81.27kWp system with full off-grid capability.
Off-grid-capable vs fully off-grid
Many of the best designs keep a grid connection but don’t depend on it. An off-grid-capable system rides through outages, caps the site’s import capacity (avoiding an expensive connection upgrade), and still sells surplus when the grid is there to take it. You get resilience without giving up the grid’s value as a trading counterparty — and Nova AI makes that trade every half hour.
When off-grid wins
- The DNO’s connection or reinforcement quote is large or slow — compare it against storage-plus-generation before accepting it.
- The site is remote and a new connection means long cable runs.
- Outages are operationally expensive — livestock, refrigeration, welfare facilities.
- Development timelines can’t wait for the grid queue.
Designed on your numbers